Current location: Home > Case > Exhaust gas

Yancheng Base Annual Production of 6 Million Blue Glass Sheets and 8 Million Heart Rate Chips Project Wastewater Treatment System

Visits:120

The designed treatment capacity for this project is: ultrapure water 15 m³/h.


Process flow: 

Raw water → Multi-media filtration system → Activated carbon filtration system → First-stage reverse osmosis → Second-stage reverse osmosis → Ultraviolet sterilizer → EDI unit → Nitrogen-sealed water tank → TOC remover → Polishing resin bed → Terminal microfiltration → Product water meets standards



1.jpg