Current location: Home > Case > Other wastewater

Papermaking Wastewater — Shandong a Wastewater Treatment, Energy Conservation and Resource Utilization Project

Visits:121

The designed treatment capacity for this project is 100,000 m³/d.


Process flow: 

Wastewater → Cylinder screen machine → Primary sedimentation tank → Equalization tank → Anaerobic reactor → Oxidation ditch system → Secondary sedimentation tank → Collection tank → Advanced oxidation system → Final sedimentation tank → Discharge after meeting standards



1.png